SECTION 8

Straightening & Tying

This section covers the process of tying the system with cable ties, pulling the form together using stringlines as a guide for straightening. The section outlines the steps for securing and aligning the QuickSet system to ensure that it is properly installed and ready for the next stage of the construction process.

8.1 — Important. Sucking In Form Using Stringline, Cable Ties, Tie Wire

8.2 — Reverse Tie to Pull QuickSet Out

8.3 — Tying Back to Mesh Only - Not Reo Bars

8.4 — Extended Tying Back to Mesh

8.5 — Overview of Straightening

8.6 — Close Up of Electrical Tie From Mesh to Widget